Hole Requiring Filling
Reported in the Roads category by Colleen Hardy at 07:23, Thu 25 October 2018
Sent to Ward 5 and Zone 1 and SMART Harare and Harare 1 minute later
There was a burst pipe that was sorted out but the long line that was dug up has not been filled properly and needs to be filled with soil to level it off and then tarring is required. There is a large number of cars that use this merge which is making the whole deeper.